Fair stand
1963
Hans Gugelot, Hans Sukopp, Peter Croy
Contractee: Max Weishaupt GmbH, Schwendi
The fair stand system consists of grids. The ceiling is made of U- and Z-sheets with hung up trough of Plexiglas. Vertical elements are transparent and massive rack plates.
Switchboard ws 1
1963/64
Hans Gugelot, Hans Sukopp
Contractee: Max Weishaupt, Schwendi
The switchboard ws 1 was first presented at the International Technical Exhibition for Sanitary and Heating Techniques. Adjustable for single- or double-stage heating systems, with operating hours counter ad libitum, for different kinds of electricity and suitable for various kinds of attachements. Mounting panel and sides of plastics, U-shaped covering plate of brushed chromium steel.
Oil burner wl 1
1963/64
Hans Gugelot, Hans Sukopp
Contractee: Max Weishaupt GmbH, Schwendi
Presented at the same exhibition, the oil burner WL 1 was made for heating of single- and double-family houses, self-contained central heating, hotel kitchens and stoves. The system works fully automatically and is adjustable to any kind of bowls and various positions.
Body of pressure casting, burner hood of stainless steel. Central control.
Radial drill
1963/64
Hans Gugelot with gugelot-institut
Constructer and manufacturer: Girard Werkzeug-Maschienen GmbH, Hagen
The scope was the design of a new radial drill more efficient and of simpler handling. The drive element was encapsulated, the controls became more ergonomic. Automatic process sequences were operated by push buttons with only one action per button.
© 2007 - 2020 gugelot gmbh, Hamburg

